Reduce heat loss
Reduce energy losses on hot pipelines, flues and equipment.
Thermal and anti-condensation insulation
We calculate the thickness, select the material, manufacture covering elements and carry out installation at new and existing facilities.
Production — Temirtau. Field works — Central, Northern and Eastern Kazakhstan.
Tasks of the enterprise
Reduce energy losses on hot pipelines, flues and equipment.
Protect cold lines with a vapor barrier layer and sealed joints.
Reduce the temperature of the external surface in accessible areas.
Cover the material with a covering layer designed for indoor or outdoor installation.
Composition of the direction
Each card opens a dedicated service or equipment page. If your requirement is not listed, send the task to an engineer.
Heating networks, hot and cold lines, process pipelines.
Thermal, enclosing and anti-condensation insulation of utility networks.
Tanks, columns, heat exchangers, boilers and technological devices.
We take into account the temperature of the medium, diameter, placement conditions and the required result.
Mineral wool for hot surfaces; elastomeric materials for cold lines.
Galvanized or stainless steel, foil and shaped casings according to the geometry of the unit.
How is the work structured?
We obtain diameters, temperatures, areas and installation conditions or take data at the site.
We determine the material, thickness, vapor barrier and design of the covering layer.
We record volumes, materials, access, phasing and work in existing production.
We produce straight and shaped elements according to the actual geometry of the units.
We install the insulation, check the joints and transfer the final volumes.
Before contacting
Diameters and surface area, ambient temperature, thickness and type of insulation, cover layer material, installation height and accessibility, object distance.
List of piping and equipment, drawings or isometrics, temperatures, installation location and desired cover layer. Files can be attached to the form below.
Specify the object and task. If you have a project, statement or technical specification, attach a file up to 10 MB.