Ventilation, dust extraction and gas cleaning for industrial and commercial facilities

We design, manufacture and install full cycle engineering systems. Own production in Temirtau, ABL equipment and experience since 2009.

Send your project — get a quotation
View equipment
Production of equipment and air ducts ABL in Temirtau
since 2009in the engineering market of Kazakhstan
40+profile objectsin 10+ industries in Kazakhstan

ABL Engineering Group LLP

Since 2009, the engineering company ABL Engineering Group has been designing, manufacturing and installing ventilation, air conditioning, smoke removal, dust extraction and gas purification systems for industrial and commercial facilities throughout Kazakhstan.

Our own production in Temirtau produces air ducts and fittings, BL series air handling units, MSF industrial filters and MDB filter and ventilation units – this allows you to control the timing, quality and cost at each facility.

  • Own production Quality control at every stage
  • Reliability and experience Working since 2009. Trusted by clients
  • Integrated delivery Design, manufacturing, installation and service
  • Modern technology Energy-efficient solutions and innovation
  • Professional team Highly qualified engineers and specialists

Approximate ventilation calculation

Express assessment online. The engineer of ABL Engineering Group will prepare an accurate calculation with the selection of equipment free of charge.

Required air exchange
Regulatory air exchange rates (SN RK 4.02-105-2014)
Required air exchange
2 400 m³/h
Cost of air ducts
Materials — according to the price list produced by ABL; installation — a guide to the enlarged estimate indicators for the Republic of Kazakhstan
Area m² · tentative
Ducting: from KZT
Installation (estimate landmark): from KZT
total from KZT

The calculation is a preliminary one and is not a quotation. The exact cost is determined after studying the project, specification, tracing, fittings, altitude, installation conditions and requirements of the facility.

Send data to engineer

Products and solutions

ABL Engineering Group equipment and products by engineering discipline — from selection and manufacturing to installation.

Cycloneдар View category Dust extraction және газды тазалау View category Standards емес желдету қондырғылары View category Standards емес өнімдер View category Valveдар мен амортизаторлар View category Zheldet және air conditioningерлеу View category Zheldetu elementteri men valvedar View category Газ ауа жылытқыштары View category Газ генераторлары View category Газ жабдықтары View category Газ термиялық перделері View category Герметикалық есіктер View category Дефлекторлар мен сорғыш zonesттар View category Желдеткіштер View category Жеңді сүзгілер View category Жергілікті MVO сорғыштары View category Жобаға арналған арнайы өнімдер View category Инфрақызыл газ сәулелендіргіштері View category Картридж сүзгілері View category Металл құрылымдар View category Өнеркәсіптік газды тазалау View category Өнеркәсіптік сүзгілер MSF View category Өткізу түйіндері View category Пішінді элементтер View category Сүзгілер мен картридждер View category Сызбаларға сәйкес бұйымдар View category Шаң бункерлері мен жинақтағыштар View category Шаң жинау қондырғылары View category Шу бәсеңдеткіштер View category Ылғал тазартқыштар View category Ventilation and air conditioning View category Dust extraction and gas cleaning View category Ventilation elements and valves View category Gas equipment View category Non-standard products View category
All equipment

Own production base

We design · manufacture · install

Our own production in Temirtau and installation teams allow us to implement engineering systems at industrial facilities of any complexity - throughout Kazakhstan.

ABL Engineering Group production base, aerial photography, Temirtau

ABL production base Temirtau

Submit your task

We will organize an engineer visit

email address mail

Plasma cutting of sheet metal with sparks on a CNC machine, produced by ABL in Temirtau

Why choose us

We design, manufacture and install ourselves - from calculations to commissioning with measurements.

Own design department

We design HVAC, dust extraction and gas cleaning ourselves - from thermal engineering calculations to working documentation. We prepare the kit for BAT and supervise the installation.

ABL design department engineer at his workplace

Own production in Temirtau

Two workshops with a total area of more than 1,000 m². We produce PVU series BL, MSF and MDB filters, air ducts and shaped elements - including non-standard ones, according to your drawings.

Two ABL specialists in corporate uniform assemble a shaped product in the workshop

Installation under a category II construction and installation license

License No. 17014063. Own installation teams and engineers at each site. We deliver with commissioning and instrumental measurements, and not “after installation”.

The ABL operator controls the DURMA machine via the CNC touch panel

50 objects in heavy industry since 2009

ArcelorMittal Temirtau, Kazzinc, Kazakhmys, Kazchrome, EuroChem, Ekibastuz GRES-2. Metallurgy, mining, energy, chemistry - throughout Kazakhstan.

Panorama of the ABL production workshop: machines and workers at work
Personal approach

Engineers for each project

Behind each project is a professional process engineer who leads it from start to finish and is responsible for quality and deadlines.

Contact about the project
  • Full cycle implementation
  • Installation work
  • Systems Design
  • Selection of equipment
  • Systems Consultation
  • Conditions - by agreement

Cost of engineering systems

Choose the right project scale

Small object
up to 500 m²

from

5,000,000 tenge.

Medium object
500–2000 m²

from

22,000,000 tenge.

Large object
2000–5000 m²

from

75,000,000 tenge.

Industrial
from 5000 m²

from

160,000,000 tenge.

The price includes the selection and supply of equipment, installation and commissioning. Design - if necessary. The exact cost is determined after receiving the technical specifications.

Our completed projects

Geography of work

Projects, supplies and fieldwork in Kazakhstan

Production is located in Temirtau. ABL primarily serves Central, Eastern and Northern Kazakhstan. Map statuses are evidence-based: completed projects, confirmed deliveries and cities within the field-service area.

Public projects Deliveries under contracts Departure zone

Do you already have an offer from another artist?

Send it to us for recalculation. We will offer you an option that may not only be cheaper in price, but also better suit your needs.

An ABL Engineering Group engineer at his workplace checks the calculation

Permitting documentation

Our licenses and certificates

We show scans of original documents without paraphrasing. Click any document to inspect the original.

Open the full register
Document register5 documents
Original scans

Useful articles

Warehouse ventilation

Order design and installation of warehouse ventilation ABL Engineering Group carries out a full cycle of work – from technical…

Office ventilation

Order installation and maintenance of office ventilation ABL Engineering Group carries out a full range of works on installation, configuration…

Engineering systems: ventilation, air conditioning, heating, smoke removal, dust extraction

ABL Engineering Group implements a full cycle of engineering systems for industrial facilities, shopping centers, warehouse complexes and office buildings of any scale. Since 2009, we have completed40+ objects– from local production workshops to large industrial enterprises at the ArcelorMittal level. Each project is implemented taking into account the individual requirements of the customer: loads, technological processes and regulatory standards.

We work in key areas of engineering systems that ensure comfort, safety and efficiency of any facility:

  • Ventilation— design and installation of supply and exhaust systems that provide standardized air exchange in industrial and commercial premises. We calculate air loads and select equipment for a specific object.
  • Air conditioning— installation of systems for maintaining air temperature in production, warehouse and office spaces. We work with industrial chillers, multi-zone systems and precision equipment.
  • Heating— installation of heat supply systems, including hot water supply, distribution of heating networks and installation of heating devices. We provide stable heat supply under any climatic loads.
  • Smoke removal— design and installation of smoke protection systems in accordance with fire safety requirements. A mandatory element for industrial buildings, retail and warehouse facilities.
  • Dust extraction— systems for industrial dust removal and air purification in industries with high concentrations of dust, chips and aerosols. Calculations of air duct networks and selection of filtering equipment are carried out. See solutionsfor metallurgy.
  • Thermal insulation— insulation of pipelines, equipment and air ducts with mineral and stone wool, polyurethane foam and foam rubber. Reduces heat loss, protects against condensation and burns, and saves energy in production.

Additionally, we carry out manufacturing and installationmetal structures (KM), concrete and reinforced concrete works (KZh) andengineering systems design— for industrial and commercial facilities in Kazakhstan.

Our own production of equipment in Temirtau (2 workshops with a total area of more than 1,000 m², a modern machine park) allows us to produce air ducts, ducts and structural elements for non-standard technical specifications – without dependence on third-party suppliers and without loss of deadlines.own installation teams work simultaneously at sites throughout Kazakhstan: in Almaty, Astana, Temirtau, Shymkent and Aktobe.

“We do not offer standard solutions. Each project begins with a site survey and technical specifications – this is the only way engineering systems can operate efficiently and reliably for many years.”— Ildar Khasanov, director of ABL Engineering Group.

Engineering systems for industrial facilities, residential buildings and premises

ABL Engineering Group designs and installs engineering systems forindustrial facilities, shopping centers, warehouse complexes andresidential buildings any scale. Since 2009, the company has sold40+ specialized projects throughout Kazakhstan – from ArcelorMittal production workshops to office and administrativepremises. Each project covers the full cycle: from technical specifications to commissioning of the facility.

We are buildinginternal engineeringnetworks and externalcommunications for objects of any complexity. Our own production of equipment in Temirtau (2 workshops with a total area of ​​more than 1000 m², a modern machine park) allows us to control quality at every stage and meet the customer’s technical requirements without dependence on third-party suppliers.

  • Ventilation— design and installation of supply and exhaust systems for production, warehouse and officepremises. Read more about ventilation →
  • Air conditioning— selection and installation of climate control equipment for thermalloads specific object.Read more about air conditioning →
  • Heating— installation of heat supply systems forindustrial facilities andresidential buildings, including connection to centralizedcommunication networks. Read more about heating →
  • Smoke removal— design of smoke protection systems in accordance with fire safety standards forindustrial buildings and public buildings.Read more about smoke removal →
  • Dust extraction— installation of dust and industrial emissions removal systems at facilities with high air quality requirements.Read more about dust extraction →

Installation work is carried out25 own brigades– without subcontracting. This ensures compliance with deadlines and a uniform quality standard at all facilities, including geographically distributed onesindustrial buildings with branchedinternal networks.

What objects are your engineering systems suitable for?
We work with B2B customers: manufacturing enterprises, metallurgical plants, shopping and logistics centers, office complexes. The minimum area of ​​the facility is 500 m². Experience working with ArcelorMittal and similar industrial customers confirms our readiness for projects of high complexity.

The process of designing and installing engineering systems with an individual approach

ABL Engineering Group provides a full cycle of work – from primarycall and technical specifications before putting the facility into operation. We understand that everyonecustomer We need solutions for a specific facility: an industrial workshop, a shopping center or a warehouse complex of any scale. That’s whyuse standard schemes are excluded – each project is developed from scratch for real loads and operating conditions.

Quality and professionalism of specialists and installation teams

Responsible for the implementation of each projectspecialists with confirmed qualifications andinstallation teams— 25 own teams that work throughout Kazakhstan. This is not a subcontract: oursprofessionals clear quality regulations developed by the company management were transferred.Individual approach to each object allows you to chooseoptimal technical solution that complies with building regulations andrequirements m of the customer.

Own production equipment at the Temirtau plant (2 workshops with an area of more than 1000 m², CNC machine park) gives us independence from third-party suppliers and full control over the quality of components. Applicabletechnology allow us to manufacture air ducts, ventilation and dust extraction system components exactly to the parameters of a specific facility – without overpaying for standardized solutions that do not fit non-standard oneseffective loads

  1. Site survey and data collection. Engineer visit, measurements, analysis of existing communication networks and low-current systems.
  2. Development of project documentation. Calculation of ventilation, air conditioning, heating, smoke removal or dust extraction systems taking into account customer requirements and current standards.
  3. Coordination and approval. Joint meetings are held with the customer, and, if necessary, the project is adjusted until it fully complies with the technical specifications.
  4. Supply of equipment. Equipment from our own production or certified suppliers – depending on the task.
  5. Installation and commissioning. The work is carried out by our own installation teams in compliance with the technological sequence and safety requirements.
  6. Delivery of the object. Checking all metering and control devices, transferring as-built documentation to the customer.

Particular attention is paid to systemsprovision microclimate and safety: calculationsubmissions air, pressure in air ducts, temperature conditions and loads on supporting structuresare carried out using engineering software. For facilities with increased fire safety requirements, smoke removal systems are designed, integrated withlow current signaling and automation networks.

Needed engineering systems for an industrial facility, warehouse or shopping center? Leave a request or makecall— our engineer will advise on the scope of work, timing and configuration during the initial consultation without obligation. We work incommunications with the customer at all stages of the project, ensuring transparency and predictable results.

Stage Responsible Result
Design VET department (headed by Korzhuk Lyubov) Set of working documentation
Equipment manufacturing Production department (headed by Alexey Korzhuk) Finished units and air ducts
Installation own installation teams Installed and configured system
Quality control Management (Ildar Khasanov, Maxim Korzhuk) Compliance with standards and customer specifications

Prices and terms of execution of engineering systems with quality guarantee

One of the key issues when ordering engineering systems for industrial facilities remains transparency: how much it costs, when it will be ready, and what happens if something goes wrong. ABL Engineering Group organizes its work so that the customer receives clear answers even at the stage of the commercial proposal – without hidden budget items and vague wording in the contract.

How prices for engineering systems are determined

The cost of design and installation of engineering systems depends on the type of object, area, chosen direction (ventilation, air conditioning, heating, smoke removal or dust extraction) and the complexity of the technical specifications. Since ABL Engineering Group hasown production of equipment in Temirtau – two workshops with an area of over 1,000 m² and CNC machines – the company eliminates the markup of intermediaries and offers competitive prices without loss of quality.

  • Transparent estimate— all positions are written out before signing the contract; budget changes are possible only if the scope of work changes at the initiative of the customer.
  • Fixed cost— for standard objects of any scale, the price is fixed in the contract and is not revised unilaterally.
  • Own equipment— production in Temirtau allows you to control costs and reduce delivery times for components.

Deadlines for completion of work

ABL Engineering Group hasown installation teams, which allows you to manage several objects in parallel and maintain an agreed schedule even under high load. Since 2009, the company has sold40+ objects— the accumulated experience allows us to accurately plan labor intensity at the design stage.

  1. Initial consultation and technical specifications – within 1 business day after contacting.
  2. Development of a project and commercial proposal – terms are agreed upon individually depending on the complexity of the object.
  3. Production and supply of equipment – due to our own workshop, the production time for non-standard components is reduced compared to outsourcing.
  4. Installation and commissioning are carried out by full-time teams without the involvement of subcontractors, which eliminates delays due to the fault of third parties.
  5. Handing over of the object and transfer of documentation – in accordance with the contractual schedule.

Guarantees of quality and reliability

The company providesguarantees for work performed and equipment installed. The terms of warranty service are fixed in the contract before the start of work – the customer knows in advance on what grounds and within what time frame any defect will be eliminated.

ABL Engineering Group’s clients include ArcelorMittal and other large industrial enterprises in Kazakhstan. Working with customers of this scale requires strict adherence to deadlines, budgets and technical requirements – these are the standards the company applies to each project, regardless of its size.

Parameter ABL Engineering Group approach
Prices Fixed in the estimate before signing the contract; own production reduces costs
Deadlines Are fixed in the contract; in-house installation teams ensure parallel construction of facilities
Guarantees Provided for work and equipment; conditions are specified in the contract
Quality control Own production + full-time installation teams without subcontracting

Ensuring comfort and safety in engineering systems

Industrial facilities, shopping centers and warehouse complexes have strict requirements for the microclimate: insufficient air exchange, unstable temperature in work areas or interruptions in the supply of hot water directly affect the productivity of personnel and the safety of equipment. ABL Engineering Group designs and installs engineering systems so that each facility receives a guaranteed level of comfort and safety – regardless of area, purpose and operational loads.

Since 2009, our specialists have implemented 40+ projects on the market – from compact office centers to large ArcelorMittal industrial sites. This experience allows the ABL Engineering Group team of professionals to accurately calculate thermal and aerodynamic loads at the design stage, eliminating installation errors, which are subsequently costly for the customer.

  • Air quality is under control. Ventilation and dust extraction systems provide normal air exchange and remove contaminants directly in the area of their formation – without risk to the health of employees.
  • Stable temperature in any season. Heating and air conditioning are calculated taking into account the real thermal loads of the room: no overheating, no drafts.
  • Uninterrupted supply of hot water. DHW utility networks are designed for peak consumption of the facility, excluding pressure drops during peak load hours.
  • Fire safety. Smoke removal systems are installed in accordance with current standards and provide smoke-free escape routes in any accident scenario.

Our own production of equipment in Temirtau – 2 workshops with an area of over 1,000 m² and a modern machine park – gives ABL Engineering Group technological independence: we manufacture air ducts, piping units and non-standard elements exactly to the parameters of your facility, without adjusting to the restrictions of a third-party supplier. This directly affects the reliability of the installed systems and reduces delivery times.

The management of the company is Ildar Khasanov (director), Maxim Korzhuk, Lyubov Korzhuk (PTO) and Alexey Korzhuk (production)— personally controls the key stages of each project. Our own installation teams work throughout Kazakhstan: Almaty, Astana, Temirtau, Shymkent, Aktobe.

Answers to frequently asked questions and handling objections

Before ordering engineering systems for an industrial facility, contact managers and technical specialistsnecessarily Questions arise about the quality of installation, compliance with standards and the reliability of the contractor. Below are honest answers to the most common ones.

  • Do your specialists have the necessary permits and licenses?
    Yes. ABL Engineering Group is a limited liability partnership with a full package of permits. All installation teams are certified, work is carried out in strict accordance with current building codes and customer requirements. Since 2009, we have implemented 40+ projects – from industrial plants to shopping centers.
  • What should I do if my property is non-standard or has a complex layout?
    It is for such cases that we take an individual approach: Technical Department engineers (headed by Korzhuk Lyubov) develop a project for specific loads, area and technological requirements. Our own production in Temirtau (CNC machine park, 2 workshops with an area of ​​more than 1,000 m²) allows us to produce non-standard equipment without overpayments to intermediaries.
  • How to make sure that the installation will be completed efficiently and on time?
    ABL Engineering Group has its own installation teams, which simultaneously work at several sites throughout Kazakhstan. Each project is led by an assigned manager, and the Technical Department monitors the compliance of the work with project documentation at each stage.
  • Do you only work with large enterprises?
    ABL Engineering Group works with objects of any scale in the B2B segment: industrial enterprises, warehouses, shopping centers, office complexes. Clients include ArcelorMittal and other large industrial customers, which confirms the level of technical expertise of the company.
  • What areas of engineering systems do you cover?
    Five key areas:ventilation, air conditioning, heating, smoke removal, dust extraction. Full cycle – from design to commissioning of the facility.
  • Is it possible to get advice before concluding a contract?
    Yes. It is enough to leave a request or call – the company’s specialists will conduct an initial analysis of the object and offer the optimal technical solution without obligation on your part.

Important: all engineering systems thathave attitude towards fire safety (smoke removal, smoke ventilation),necessarily are designed and installed in accordance with the current fire safety standards of the Republic of Kazakhstan. Before starting workshould coordinate the terms of reference with the relevant services – our engineers accompany this process.

If you still have questions about a specific area, check outequipment catalogor contact the project director directly.LLP ABL Engineering Group operates throughout Kazakhstan: Almaty, Astana, Temirtau, Shymkent, Aktobe.

Frequently Asked Questions

We design and install supply, exhaust, supply and exhaust ventilation, air conditioning, smoke removal and dust extraction systems. We work with industrial, commercial and administrative facilities of any complexity.

The cost depends on the area of the facility, the number of systems and the type of building. Approximately – from 500 tenge/m² for simple objects. We provide an accurate estimate free of charge after receiving the technical specifications.

The timing depends on the scale of the project. Small object (up to 500 m²) – from 2 to 4 weeks. Large industrial facilities – from 1 to 3 months. We fix the exact terms in the contract after the examination.

Our office and our own production are located in Temirtau, while we carry out projects throughout Kazakhstan – Astana, Karaganda, Shymkent, Aktobe, Atyrau and other cities. An engineer’s visit to the site is included in the cost of the work.

Yes, we provide a guarantee for all installation work from 12 to 36 months, depending on the type of system. The equipment is covered by the manufacturer’s warranty. After installation we offer service.

Leave a request on the website or call us. The engineer will conduct a free consultation, visit the site and prepare a commercial proposal. After approval, we conclude an agreement and begin work.

Describe your task

We will contact you and arrange an engineer visit

+7 (771) 006-77-11  |  giza@abl.kz