Anti-smoke ventilation for buildings and industries

Smoke removal and air pressurization systems

We design, install and maintain smoke ventilation. We link fans, valves, air ducts, automation and work algorithms with the fire safety project.

  • Smoke removal from premises and escape routes
  • Air supply to staircases, elevator shafts and airlocks
  • Fans, valves, air ducts and automation
Send a project - receive a CP

Production — Temirtau. Field works — Central, Northern and Eastern Kazakhstan.

Tasks of the enterprise

What problems does anti-smoke ventilation solve?

New object

It is necessary to develop a coordinated system based on the building’s initial data and fire safety requirements.

Reconstruction

The layout, purpose of premises, evacuation routes or the composition of engineering systems change.

Uncoordinated automation

Valves, fans and fire alarms are not integrated into a verifiable algorithm.

The system does not pass the test

We need diagnostics of the project and installation, checking of equipment and elimination of specific comments.

How is the work structured?

From input data to system handover

  1. 01

    Source documents

    We check architectural plans, fire compartments, escape routes and assignments of related sections.

  2. 02

    Calculation and algorithm

    We determine costs, pressure, equipment composition and operation sequence.

  3. 03

    Working documentation

    We link routes, valves, fans, power supply and automation.

  4. 04

    Installation and connections

    We fulfill the scope stipulated by the contract and record deviations from the project.

  5. 05

    Due diligence

    We check commands, valve positions, equipment startup and actual modes.

Before contacting

This will help you evaluate the task faster

What is needed for assessment

Sections of the project for ventilation and fire automatics, building plans, specifications, list of comments or inspection report - depending on the task.

Limit of responsibility

Before the calculation, we fix who is responsible for the project, power supply, fire alarm, dispatch, fire protection and comprehensive testing.

  • Since 2009 engineering direction
  • Temirtau own production
  • Construction and installation works of category II license No. 17014063
  • Full cycle from calculation to launch

PDF, DWG, DXF, JPG, PNG, Doc or DOCX — up to 10 MB