Fonet Er-Tai AK Mining LLP
Complete installation of engineering systems and construction and installation works for the hydrometallurgical plant site.
Read More →We design and install water systems from the heat source to indoor appliances. We calculate loads, hydraulics, diameters, pumps, fittings and regulation.
They trust us
The system is suitable for production, warehouse and administrative areas if there is a reliable heat source. The type of devices is selected according to height, temperature profile, contamination, accessibility of service and technology requirements.
Have plans, design or specification? Attach materials and an engineer will check the data for evaluation.
Get CPAfter installation, we carry out the tests, flushing and filling of the system provided for in the project. The setup includes checking pumps, fittings, automation and flow distribution across branches.
We need plans and elevations, design temperatures, heat source parameters, existing layout, zone requirements and operating plant limitations. If the data is insufficient, the engineer will generate a list of clarifications.
The assessment is influenced by thermal power, length and diameters of networks, number of devices, heating point, pumps, automation, insulation and accessibility of installation. We fix the estimate after checking the initial data and work boundaries.
The main geography is Karaganda, Pavlodar, Ust-Kamenogorsk, Zhezkazgan, Semey, Astana, Kokshetau, Kostanay and Petropavlovskovsk. We will determine the possibility of leaving after studying the property.
The full scope of work is described on the pageinstallation of industrial heating.
Complete installation of engineering systems and construction and installation works for the hydrometallurgical plant site.
Read More →A series of industrial orders for insulation and related work at the Linde production site…
Read More →Complete filter ventilation system: equipment, production of air ducts and installation on site in Karaganda.
Read More →After checking the available power, temperature curve, pressure and connection conditions.
Based on room load, coolant parameters, height, contamination, equipment placement and operating requirements.
Yes, from the initial assessment. The engineer will check the available plans and parameters of the site, then list the missing data and the required design scope.
After checking the design load, equipment composition, routes, automation and installation conditions. The proposal sets out boundaries and assumptions.
Central, Northern and Eastern Kazakhstan: Karaganda, Pavlodar, Ust-Kamenogorsk, Zhezkazgan, Semey, Astana, Kokshetau, Kostanay and Petropavlovskovsk.
Types of heating systems for industrial and commercial buildings, criteria for selecting equipment, energy efficiency and maintenance.
Installation of ventilation systems at sites: preparation, laying of air ducts, installation of equipment, commissioning and delivery.
A complete guide to designing HVAC systems for commercial and industrial facilities. Norms, stages, standard solutions.
The engineer will examine the materials and clarify the missing parameters. We will agree on the deadline for preparing a commercial proposal after checking the initial data.