Cooperation format
Industrial subcontracting at different sites
Perform industrial subcontracting at various production sites - from individual engineering systems to complex supply and installation of equipment.
Completed stages
What is included in the cooperation program
-
01
Installation of ventilation for a warehouse of crushed ore and finished products.
-
02
Heating, ventilation, water supply and sewerage systems for activated carbon production.
-
03
Industrial thermal insulation at the Aksu ferroalloy plant.
-
04
Construction and installation work and equipment for the Er-Tai hydrometallurgical plant site.
Project Development
Key Milestones
-
2017
Crushed ore warehouse
Installation of a ventilation system at a facility in the area of the Kok-John and Gimmelfarbskoye deposits.
-
2018
Production of activated carbon
Installation of air conditioning and air conditioning systems in Nurinskoye area.
-
2019
Aksu-1
Installation of thermal insulation with a protective covering layer.
-
2025
Er-Tai
Construction and installation work and provision of engineering equipment for the hydrometallurgical plant site.