Fonet Er-Tai AK Mining LLP
Complete installation of engineering systems and construction and installation works for the hydrometallurgical plant site.
Read More →We install heating points, pipelines, instruments, air heating equipment and automation according to the project. We work at new and existing production facilities.
They trust us
We install the heating equipment, pumping groups, heat exchangers, pipelines, fittings and heating devices specified in the project. For air heating, we install air heaters, fan heaters, air ducts and control elements within the agreed limits.
Do you have a project, plans or terms of reference? Attach materials and an engineer will check the data for evaluation.
Get CPSubmit the project, specification, bill of quantities, parameters of the heat source, data on the supply of equipment and the readiness of the construction part. If some of the data is missing, attach available materials and describe the task – the engineer will generate a list of clarifications.
The calculation is influenced by the power and composition of the equipment, the diameters and length of pipelines, the volume of instruments and fittings, height, insulation, automation and limitations of the operating facility. We determine the price and term only after checking the initial data. In the commercial proposal we fix the composition, boundaries of work, assumptions and phasing.
We work in Central, Northern and Eastern Kazakhstan: Karaganda, Pavlodar, Ust-Kamenogorsk, Zhezkazgan, Semey, Astana, Kokshetau, Kostanay and Petropavlovskovsk. The need for departure and the mobilization schedule are determined after studying the materials.
If there is no project, start withindustrial heating design.
Complete installation of engineering systems and construction and installation works for the hydrometallurgical plant site.
Read More →A series of industrial orders for insulation and related work at the Linde production site…
Read More →Complete filter ventilation system: equipment, production of air ducts and installation on site in Karaganda.
Read More →Yes, if the design and operational constraints allow the system to be separated. The stages, temporary connections and tests will be agreed upon before the start of work.
Included if indicated in the project and estimate. The material, thickness and cover layer are fixed separately from the installation of pipelines.
Yes, from the initial assessment. After studying the materials, the engineer will list the missing data and determine whether a visit is needed.
After checking the initial data, scope of work and site conditions. The proposal sets out the scope of work, assumptions and phasing.
The main geography is Karaganda, Pavlodar, Ust-Kamenogorsk, Zhezkazgan, Semey, Astana, Kokshetau, Kostanay and Petropavlovskovsk.
Installation of ventilation systems at sites: preparation, laying of air ducts, installation of equipment, commissioning and delivery.
A complete guide to designing HVAC systems for commercial and industrial facilities. Norms, stages, standard solutions.
Order design and installation of warehouse ventilation ABL Engineering Group carries out a full cycle of work – from technical…
The engineer will examine the materials and clarify the missing parameters. We will agree on the deadline for preparing a commercial proposal after checking the initial data.