Heat supply for industrial and warehouse facilities

Industrial heating: calculation, installation and maintenance

We select the system according to the heat loss of the building, the height of the premises, the production mode and the available heat source. We work with water and air heating.

  • Calculation of heat loss and system hydraulics
  • Heating points, pipelines, instruments and automation
  • Installation, crimping, adjustment and service
Send a project - receive a CP

Production — Temirtau. Field works — Central, Northern and Eastern Kazakhstan.

Tasks of the enterprise

When an industrial facility requires a new heating solution

Uneven heating

The work area remains cold, and heat accumulates under the roof of a high room.

Insufficient power

After expanding the building or changing the operating mode, the existing system does not cover heat loss.

High losses

The network is unbalanced, the pipelines are not insulated, or the automation does not take into account the actual load.

Worn out system

Replacement of sections, devices, fittings or reconstruction without stopping the entire enterprise is required.

How is the work structured?

From input data to system handover

  1. 01

    Initial data

    We receive plans, fencing designs, temperatures, operating modes and heat source data.

  2. 02

    Calculation

    We determine heat loss, power by zone, coolant flow rate and equipment parameters.

  3. 03

    Project and estimate

    We fix the scheme, equipment, automation, delivery boundaries and work schedule.

  4. 04

    Installation

    We install equipment and networks taking into account the access and mode of the existing facility.

  5. 05

    Testing and transfer

    We carry out the checks, configuration and transfer of documentation provided for in the contract.

Before contacting

This will help you evaluate the task faster

What to send for calculation

Plans and sections, areas and heights, enclosure materials, required temperatures, operating mode, existing heat source and available limits.

Why is there no fixed price per square meter

The same area can have different heights, heat losses, heat sources, routes and redundancy requirements. The cost is determined after engineering calculations and checking the boundaries of the work.

  • Since 2009 engineering direction
  • Temirtau own production
  • Construction and installation works of category II license No. 17014063
  • Full cycle from calculation to launch

PDF, DWG, DXF, JPG, PNG, Doc or DOCX — up to 10 MB