Uneven heating
The work area remains cold, and heat accumulates under the roof of a high room.
Heat supply for industrial and warehouse facilities
We select the system according to the heat loss of the building, the height of the premises, the production mode and the available heat source. We work with water and air heating.
Production — Temirtau. Field works — Central, Northern and Eastern Kazakhstan.
Tasks of the enterprise
The work area remains cold, and heat accumulates under the roof of a high room.
After expanding the building or changing the operating mode, the existing system does not cover heat loss.
The network is unbalanced, the pipelines are not insulated, or the automation does not take into account the actual load.
Replacement of sections, devices, fittings or reconstruction without stopping the entire enterprise is required.
Composition of the direction
Each card opens a dedicated service or equipment page. If your requirement is not listed, send the task to an engineer.
Thermal and hydraulic calculations, diagrams, specifications and automation.
More detailsHeating points, pipelines, instruments, fittings and preparation of the system for start-up.
More detailsChecking equipment and fittings, diagnostics of operating conditions and preparation for the season.
More detailsHow is the work structured?
We receive plans, fencing designs, temperatures, operating modes and heat source data.
We determine heat loss, power by zone, coolant flow rate and equipment parameters.
We fix the scheme, equipment, automation, delivery boundaries and work schedule.
We install equipment and networks taking into account the access and mode of the existing facility.
We carry out the checks, configuration and transfer of documentation provided for in the contract.
Before contacting
Plans and sections, areas and heights, enclosure materials, required temperatures, operating mode, existing heat source and available limits.
The same area can have different heights, heat losses, heat sources, routes and redundancy requirements. The cost is determined after engineering calculations and checking the boundaries of the work.
Specify the object and task. If you have a project, statement or technical specification, attach a file up to 10 MB.