Fonet Er-Tai AK Mining LLP
Complete installation of engineering systems and construction and installation works for the hydrometallurgical plant site.
Read More →We design and install multi-zone systems for facilities with independent room conditions. We select the configuration based on thermal load, route lengths and operating requirements.
They trust us
The system is suitable for buildings with a large number of premises and different schedules: office centers, hotels, administrative and commercial facilities. For large open workshops or centralized cooling supply, we compare the solution with a chiller-fan coil.
Have plans, design or specification? Attach materials and an engineer will check the data for evaluation.
Get CPConvey plans, zone assignments, operating modes, known heat dissipations, outdoor unit locations, and available electrical power. If the data is insufficient, the engineer will generate a list of clarifications.
The assessment is influenced by the number of blocks and zones, the length of routes, elevation changes, drainage, automation, height and readiness of the construction part. We fix the estimate after checking the initial data and work boundaries.
The main geography is Karaganda, Pavlodar, Ust-Kamenogorsk, Zhezkazgan, Semey, Astana, Kokshetau, Kostanay and Petropavlovskovsk. We will determine the possibility of leaving after studying the property.
For large district cooling, compare the solution withchiller-fan coil system.
Complete installation of engineering systems and construction and installation works for the hydrometallurgical plant site.
Read More →A series of industrial orders for insulation and related work at the Linde production site…
Read More →Complete filter ventilation system: equipment, production of air ducts and installation on site in Karaganda.
Read More →VRF is designed for a larger number of zones, a developed network of pipelines and centralized control. Specific restrictions depend on the selected equipment series.
Yes, provided you have a compatible interface. The protocol, gateways and list of transmitted parameters are agreed upon in the project.
Yes, from the initial assessment. The engineer will check the available plans and parameters of the site, then list the missing data and the required design scope.
After checking the design load, equipment composition, routes, automation and installation conditions. The proposal sets out boundaries and assumptions.
Central, Northern and Eastern Kazakhstan: Karaganda, Pavlodar, Ust-Kamenogorsk, Zhezkazgan, Semey, Astana, Kokshetau, Kostanay and Petropavlovskovsk.
Order design and installation of warehouse ventilation ABL Engineering Group carries out a full cycle of work – from technical…
Order installation and maintenance of office ventilation ABL Engineering Group carries out a full range of works on installation, configuration…
Types of heating systems for industrial and commercial buildings, criteria for selecting equipment, energy efficiency and maintenance.
The engineer will examine the materials and clarify the missing parameters. We will agree on the deadline for preparing a commercial proposal after checking the initial data.