Supply of Hitachi, OUTES and Citec for industrial and commercial facilities

Industrial air conditioning: equipment supply and installation

We supply VRF/VRV systems, chillers, fan coil units and precision air conditioners by Hitachi, OUTES and Citec. We select equipment by heat gains and project and install it on request. Delivery in about 4 weeks on average, 12–24 month warranty, price on request.

  • Supply of VRF/VRV systems, chillers, fan coils and precision air conditioners
  • Selection by heat gains and commercial proposal
  • Installation, commissioning and 12–24 month warranty
Send a project - receive a CP

Production — Temirtau. Field works — Central, Northern and Eastern Kazakhstan.

Tasks of the enterprise

When a facility needs an engineered air conditioning system

Equipment overheating

Process lines, server rooms, or electrical rooms generate more heat than the existing system can remove.

Different modes by zone

Workshops, warehouses, offices and technical premises require different temperatures and work schedules.

Object extension

A new line or additional area changes the thermal load and available electrical power.

High operating costs

The equipment operates without coordinated control, redundancy and accounting of the actual load.

How is the work structured?

From input data to system handover

  1. 01

    Initial data

    We receive plans, purpose of premises, operating mode, heat dissipation and reservation requirements.

  2. 02

    Load calculation

    We determine heat inflows by zone and check restrictions on power supply and location.

  3. 03

    Scheme and equipment

    We select the type of system, equipment, routes, drainage, automation and delivery boundaries.

  4. 04

    Installation

    We carry out work according to the agreed project and schedule, taking into account the existing facility.

  5. 05

    Start and transfer

    We check the modes, settings and the set of documentation provided for in the contract.

Before contacting

This will help you evaluate the task faster

What to send for initial assessment

Room layouts and elevations, zone assignments, operating modes, known heat dissipations, existing equipment and available electrical power.

What affects the cost

Estimated cooling capacity, type and quantity of equipment, length of routes, automation, redundancy, height and accessibility of installation.

  • Since 2009 engineering direction
  • Temirtau own production
  • Construction and installation works of category II license No. 17014063
  • Full cycle from calculation to launch

PDF, DWG, DXF, JPG, PNG, Doc or DOCX — up to 10 MB