Industrial ventilation design

We design supply, exhaust and supply and exhaust systems for factories, workshops, warehouses and industrial complexes. We produce calculations, diagrams, specifications and documentation for procurement and installation.

  • Calculation of air exchange taking into account technology, heat, moisture, dust and gases
  • System diagrams, air duct routing and equipment selection
  • Linking solutions with architecture, technology, heating, electrical and automation
  • The project as a separate service or part of a full cycle before the system is launched
Project ABL Engineering Group - — JSC "KARTSMENT"
since 2009 Engineering direction
40+ Core projects
Temirtau Own production
SMR II License No. 17014063

They trust us

Kazakhmys
Kazzinc
ArcelorMittal / Qarmet
TNK Kazchrome (ERG)
Borusan Makina
Polymetal
Kazakhstan Temir Zholy
01

When an industrial facility needs a ventilation project

A project is needed before purchasing equipment and starting installation if the system is being built from scratch, production is being expanded, or the existing ventilation cannot cope with heat, dust, moisture, odors or process emissions. Without calculations, it is easy to get insufficient air exchange, excess energy consumption, noise and conflicts between routes and building structures.

For an existing enterprise, we first fix the problem and the operating mode of the facility, then determine whether reconstruction of individual sections is sufficient or whether a new system is needed.

02

What is included in the design result

  • initial data and agreed technical specifications;
  • calculation of air exchange and air balances in rooms;
  • schematic diagrams and plans for laying air ducts;
  • selection of fans, installations, filters, valves and air distributors;
  • requirements for power supply and automation;
  • specification of equipment and materials.

The composition of the documentation is fixed before the start of work: it depends on the stage of the project, the purpose of the object and who will carry out the purchase and installation.

Do you have a project or statement? Submit the materials and we will check the composition of the data for the calculation.

Get CP
03

What initial data speeds up the calculation?

For an initial assessment, floor plans, heights, zone assignments, operating modes, number of employees, process equipment parameters and descriptions of allocations are useful. If there is an existing project, equipment list, photo or measurement results, attach them to the application.

If there is no ready-made technical specification, we will start with a list of questions and determine what surveys and measurements are needed before the calculation.

04

How is the project going?

  1. Let’s analyze the problem: purpose of the object, technology and limitations.
  2. Collecting initial data: documentation, measurements and requirements of related sections.
  3. We perform calculations: We determine air flow rates, network resistance and equipment parameters.
  4. We develop solutions: We prepare diagrams, plans and specifications.
  5. We deliver the kit: We coordinate the comments within the approved assignment and prepare data for purchase or installation.

The deadline is determined after checking the initial data: the area itself does not indicate the complexity of the production facility.

05

Design for Central, Northern and Eastern Kazakhstan

We work with objects in Karaganda, Pavlodar, Ust-Kamenogorsk, Zhezkazgan, Semey, Astana, Kokshetau, Kostanay and Petropavlovskovsk. Part of the preparation is carried out using documentation and video communication; The need for a visit is determined after studying the site and available materials.

If necessary, we can continue the projectproduction and installation of industrial ventilation.

Our projects

FLSmidth LLP

Complete filter ventilation system: equipment, production of air ducts and installation on site in Karaganda.

Read More →

Frequently Asked Questions

Plans or drawings of the facility, the purpose of the premises, a description of the technological process, mode of operation and known sources of heat, dust, moisture or gases. If some of the data is missing, indicate this in the message – the engineer will make a list of the missing information.

Yes. First, we fix the business problem and production features, then we formulate the requirements for the system and the composition of the initial data. The scope of this stage will be agreed upon separately.

Yes. The composition and format of the documentation will be agreed upon in advance, taking into account who will purchase the equipment and perform the installation.

After checking the source data. The assessment is influenced by the area and number of zones, the complexity of the technology, the presence of a survey, the composition of the documentation and the amount of linkage with adjacent sections.

Yes. For an existing facility, we take into account access to equipment, the possibility of stopping sections and the requirements for phased reconstruction.

The main geography is Central, Northern and Eastern Kazakhstan: Karaganda, Pavlodar, Ust-Kamenogorsk, Zhezkazgan, Semey, Astana, Kokshetau, Kostanay and Petropavlovskovsk.

PDF, DWG, DXF, JPG, PNG, Doc or DOCX — up to 10 MB