Installation of smoke removal systems

We install fans, valves, air ducts and smoke ventilation connections specified in the project. Before starting work, we check documentation, fire protection, power supply and automation limits.

  • Smoke fans, valves and ducts
  • Pressure and compensation air supply systems
  • Automation connections and signals within agreed limits
  • Comprehensive testing of modes according to the approved program
since 2009 Engineering direction
40+ Core projects
Temirtau Own production
SMR II License No. 17014063

They trust us

Kazakhmys
Kazzinc
ArcelorMittal / Qarmet
TNK Kazchrome (ERG)
Borusan Makina
Polymetal
Kazakhstan Temir Zholy
01

What is included in the installation of smoke ventilation

We install smoke fans, valves and drives, lay air ducts, mount supports and connecting sections. Work on fire protection, electrical supply, fire alarm and dispatch is included only within explicitly agreed boundaries.

02

The facility is ready before the brigade leaves

  • approved design and specification;
  • finished foundations, shafts, openings and penetrations;
  • access to installation sites and equipment lifting paths;
  • fire protection solution for air ducts and structures;
  • power supply and automation interfaces;
  • coordinated schedule of related contractors.

Do you have a project, plans or terms of reference? Attach materials and an engineer will check the data for evaluation.

Get CP
03

Check after installation

We check the actual position of the valves, the direction of rotation and start of the fans, the passage of commands and feedback signals within the scope of the work performed. Comprehensive tests are carried out according to an agreed program with the participation of those responsible for fire automatics and power supply.

04

What to submit for preliminary assessment

Submit the smoke removal and automation project, specification, bill of quantities, data on the supply of equipment, fire protection, power supply and readiness of the construction part. If some of the data is missing, attach available materials and describe the task – the engineer will generate a list of clarifications.

05

What does the cost and term depend on?

The calculation is influenced by the number and weight of fans, valves and drives, the area of air ducts, fire resistance, work height, lifting equipment, automation and accessibility of installation areas. We determine the price and term only after checking the initial data. In the commercial proposal we fix the composition, boundaries of work, assumptions and phasing.

06

Geography and the next stage

We work in Central, Northern and Eastern Kazakhstan: Karaganda, Pavlodar, Ust-Kamenogorsk, Zhezkazgan, Semey, Astana, Kokshetau, Kostanay and Petropavlovskovsk. The need for departure and the mobilization schedule are determined after studying the materials.

If the project is missing or requires review, start withdesign of smoke removal systems.

Our projects

LLP “RG Gold”

Detailed documentation, supply, installation and commissioning of dust extraction of three crushing and sintering complexes.

Read More →

Frequently Asked Questions

Yes, after checking the completeness, specifications and site conditions. We fix technical contradictions before purchasing and installation.

The composition of participants depends on the boundaries of the agreements. Usually we need people responsible for ventilation, fire automatics, power supply and operation of the facility.

Yes, from the initial assessment. After studying the materials, the engineer will list the missing data and determine whether a visit is needed.

After checking the initial data, scope of work and site conditions. The proposal sets out the scope of work, assumptions and phasing.

The main geography is Karaganda, Pavlodar, Ust-Kamenogorsk, Zhezkazgan, Semey, Astana, Kokshetau, Kostanay and Petropavlovskovsk.

PDF, DWG, DXF, JPG, PNG, Doc or DOCX — up to 10 MB