Fonet Er-Tai AK Mining LLP
Complete installation of engineering systems and construction and installation works for the hydrometallurgical plant site.
Read More →We install multi-split systems for office, administrative and commercial premises: outdoor unit, several indoor units, refrigerant lines, drainage and controls. We do not work with apartments.
They trust us
A multi-split system is one outdoor unit and several indoor units. It suits small office and administrative zones where a VRF system or chiller is not justified. For buildings with many rooms VRF/VRV systems are usually chosen.
Installation of outdoor and indoor units, refrigerant lines and drainage, power and control connection, evacuation, charging if required and commissioning within the agreed scope.
Do you have a project, specification or photos? Attach materials and an engineer will check the data for evaluation.
Get CPSend room plans, their purpose and loads, location for the outdoor unit, line lengths, noise requirements and timing.
We prepare a commercial proposal after checking the initial data and work boundaries. The cost depends on the equipment, the scope and complexity of routes, height and access, the operating mode of the existing facility, materials and required documents. The timeline is agreed together with site access and equipment delivery.
Installation is carried out by ABL specialists in Central, Northern and Eastern Kazakhstan: Karaganda, Temirtau, Astana, Pavlodar, Kokshetau, Kostanay, Petropavlovsk, Ust-Kamenogorsk, Semey, Zhezkazgan. We supply equipment to any region of Kazakhstan. Installation in other regions and at remote sites is possible — travel and mobilization are calculated separately.
Complete installation of engineering systems and construction and installation works for the hydrometallurgical plant site.
Read More →A series of industrial orders for insulation and related work at the Linde production site…
Read More →Complete filter ventilation system: equipment, production of air ducts and installation on site in Karaganda.
Read More →No. We work only with commercial and industrial facilities.
The warranty on installation works is 12 months. Equipment is covered by the manufacturer’s or supplier’s warranty under the contract terms.
Yes, from the initial assessment. After studying the available materials, we will determine what data is missing and whether a site visit is needed.
After checking the initial data, equipment composition, scope of work and site conditions. The commercial proposal fixes the scope of work and calculation assumptions.
Installation — in Central, Northern and Eastern Kazakhstan. We supply equipment to any region of Kazakhstan; installation in other regions is calculated separately.
Order design and installation of warehouse ventilation ABL Engineering Group carries out a full cycle of work – from technical…
Order installation and maintenance of office ventilation We carry out installation in Central, Northern and Eastern Kazakhstan and supply equipment…
Types of heating systems for industrial and commercial buildings, criteria for selecting equipment, energy efficiency and maintenance.
The engineer will examine the materials and clarify the missing parameters. We will agree on the deadline for preparing a commercial proposal after checking the initial data.