Complete filter ventilation system: equipment, production of air ducts and installation on site in Karaganda.

ABLProject dossier
1

complete filter and ventilation system

  • Filter
  • Air ducts
  • Installation
2022
Direction
Filtration ventilation
Period
2022
Geography
Karaganda
Filter ventilation system
1 set

Object task

What needed to be done

Install a self-cleaning filter and assemble a single system at the site along with ventilation equipment and air ducts.

ABL Area of Responsibility

What was done at the site

4 workstreams
  1. 01

    Self-cleaning filter MDV-6L-F11-T20.

  2. 02

    Fan, dust collector, pre-filter and control cabinet.

  3. 03

    Manufacture of air ducts and flange connections.

  4. 04

    Delivery and installation of equipment, filter and air duct system.

Project scope

One contractor completed the kitting, in-house production of air ducts, delivery and installation of the filter ventilation system.