LLP “RG Gold”
Detailed documentation, supply, installation and commissioning of dust extraction of three crushing and sintering complexes.
Read More →We select precision air conditioning for rooms where stable parameters and continuity of operation are important. We calculate actual heat dissipation, air flow patterns and redundancy.
They trust us
In a server room, the load is generated by the equipment and operates constantly. The decision must take into account the high proportion of sensible heat, year-round operation, air distribution across the racks, allowable downtime, and the method of heat dissipation.
Have plans, design or specification? Attach materials and an engineer will check the data for evaluation.
Get CPBefore work, we will coordinate routes, dust protection, technological windows and temporary cooling, if required. Switching and testing are carried out in an agreed sequence with responsible customer representatives.
Submit plans, list and capacity of equipment, current load, expansion prospects, acceptable parameters, power supply diagram and redundancy requirements. If the data is insufficient, the engineer will generate a list of clarifications.
The assessment is influenced by the heat load, the number of working and standby units, the method of heat removal, routes, power supply, monitoring and working conditions in the existing premises. We fix the estimate after checking the initial data and work boundaries.
The main geography is Karaganda, Pavlodar, Ust-Kamenogorsk, Zhezkazgan, Semey, Astana, Kokshetau, Kostanay and Petropavlovskovsk. We will determine the possibility of leaving after studying the property.
A general calculation of the climate system can be started from the pageair conditioning design.
Detailed documentation, supply, installation and commissioning of dust extraction of three crushing and sintering complexes.
Read More →Two stages of industrial work at the Aksu Ferroalloy Plant site: thermal insulation and construction…
Read More →Complete installation of engineering systems and construction and installation works for the hydrometallurgical plant site.
Read More →Based on acceptable shutdown risk, actual and future load, available power supply and operating requirements.
Sometimes – in stages or with temporary cooling. The possibility is determined after inspection and approval of the technological window.
Yes, from the initial assessment. The engineer will check the available plans and parameters of the site, then list the missing data and the required design scope.
After checking the design load, equipment composition, routes, automation and installation conditions. The proposal sets out boundaries and assumptions.
Central, Northern and Eastern Kazakhstan: Karaganda, Pavlodar, Ust-Kamenogorsk, Zhezkazgan, Semey, Astana, Kokshetau, Kostanay and Petropavlovskovsk.
Order design and installation of warehouse ventilation ABL Engineering Group carries out a full cycle of work – from technical…
Order installation and maintenance of office ventilation We carry out installation in Central, Northern and Eastern Kazakhstan and supply equipment…
Types of heating systems for industrial and commercial buildings, criteria for selecting equipment, energy efficiency and maintenance.
The engineer will examine the materials and clarify the missing parameters. We will agree on the deadline for preparing a commercial proposal after checking the initial data.