Installation of precision air conditioners

We select precision air conditioning for rooms where stable parameters and continuity of operation are important. We calculate actual heat dissipation, air flow patterns and redundancy.

  • Server, data center and process rooms
  • Calculation of sensible thermal load of equipment
  • Reservation and rotation of work blocks
  • Monitoring of accidents, temperatures and modes
since 2009 Engineering direction
40+ Core projects
Temirtau Own production
SMR II License No. 17014063

They trust us

Kazakhmys
Kazzinc
ArcelorMittal / Qarmet
TNK Kazchrome (ERG)
Borusan Makina
Polymetal
Kazakhstan Temir Zholy
01

Why is a household air conditioner not enough?

In a server room, the load is generated by the equipment and operates constantly. The decision must take into account the high proportion of sensible heat, year-round operation, air distribution across the racks, allowable downtime, and the method of heat dissipation.

02

What is included in engineering selection

  • inventory of current and future IT load;
  • air supply and return diagram;
  • working and reserve power;
  • placement of internal and external components;
  • power supply and automatic restoration;
  • monitoring and dispatch signals.

Have plans, design or specification? Attach materials and an engineer will check the data for evaluation.

Get CP
03

Installation without risk for an existing server room

Before work, we will coordinate routes, dust protection, technological windows and temporary cooling, if required. Switching and testing are carried out in an agreed sequence with responsible customer representatives.

04

What to submit for evaluation

Submit plans, list and capacity of equipment, current load, expansion prospects, acceptable parameters, power supply diagram and redundancy requirements. If the data is insufficient, the engineer will generate a list of clarifications.

05

What does the cost and term depend on?

The assessment is influenced by the heat load, the number of working and standby units, the method of heat removal, routes, power supply, monitoring and working conditions in the existing premises. We fix the estimate after checking the initial data and work boundaries.

06

Geography and related solution

The main geography is Karaganda, Pavlodar, Ust-Kamenogorsk, Zhezkazgan, Semey, Astana, Kokshetau, Kostanay and Petropavlovskovsk. We will determine the possibility of leaving after studying the property.

A general calculation of the climate system can be started from the pageair conditioning design.

Our projects

FLSmidth LLP

Complete filter ventilation system: equipment, production of air ducts and installation on site in Karaganda.

Read More →

Frequently Asked Questions

Based on acceptable shutdown risk, actual and future load, available power supply and operating requirements.

Sometimes – in stages or with temporary cooling. The possibility is determined after inspection and approval of the technological window.

Yes, from the initial assessment. The engineer will check the available plans and parameters of the site, then list the missing data and the required design scope.

After checking the design load, equipment composition, routes, automation and installation conditions. The proposal sets out boundaries and assumptions.

Central, Northern and Eastern Kazakhstan: Karaganda, Pavlodar, Ust-Kamenogorsk, Zhezkazgan, Semey, Astana, Kokshetau, Kostanay and Petropavlovskovsk.

Articles on the topic

Warehouse ventilation

Order design and installation of warehouse ventilation ABL Engineering Group carries out a full cycle of work – from technical…

Office ventilation

Order installation and maintenance of office ventilation ABL Engineering Group carries out a full range of works on installation, configuration…

PDF, DWG, DXF, JPG, PNG, Doc or DOCX — up to 10 MB