Industrial heating design

We calculate the heat loss of the building and loads by zone, select a water, air or combined system. We produce diagrams, plans, specifications and requirements for automation.

  • Calculation of heat loss and power by room
  • Water, air or combined heating
  • Hydraulic calculation, equipment and automation
  • Linking with ventilation, architecture and heat source
since 2009 Engineering direction
40+ Core projects
Temirtau Own production
SMR II License No. 17014063

They trust us

Kazakhmys
Kazzinc
ArcelorMittal / Qarmet
TNK Kazchrome (ERG)
Borusan Makina
Polymetal
Kazakhstan Temir Zholy
01

What data is included in the thermal calculation

We take into account the areas and volumes of premises, fencing structures, windows and gates, design temperatures, infiltration, operating mode and internal heat dissipation. For tall workshops, we separately evaluate the temperature distribution by height and working areas.

02

How to choose a heating system

  • Water: radiators, registers, convectors or fan heaters with coolant.
  • Air: heating and air distribution for large volumes.
  • Combined: various solutions for production, warehouse and administrative areas.

The choice depends on the heat source, height, object mode, technology requirements and permissible inertia of the system.

Do you have a project, plans or terms of reference? Attach materials and an engineer will check the data for evaluation.

Get CP
03

Design result

  • heat loads by rooms and zones;
  • schematic diagram and plans for laying networks;
  • hydraulic calculations and pipeline diameters;
  • selection of heating devices, pumps and fittings;
  • requirements for automation and regulation;
  • specification of equipment and materials.
04

What to submit for preliminary assessment

We need plans and sections, fencing materials, heights, purpose and mode of premises, required temperatures, heat source data and available limits. If some of the data is missing, attach available materials and describe the task – the engineer will generate a list of clarifications.

05

What does the cost and term depend on?

The assessment is influenced by the area and height of the object, the number of zones, the completeness of data on fencing, the complexity of the heat source, the composition of automation and design documentation. We determine the price and term only after checking the initial data. In the commercial proposal we fix the composition, boundaries of work, assumptions and phasing.

06

Geography and the next stage

We work in Central, Northern and Eastern Kazakhstan: Karaganda, Pavlodar, Ust-Kamenogorsk, Zhezkazgan, Semey, Astana, Kokshetau, Kostanay and Petropavlovskovsk. The need for departure and the mobilization schedule are determined after studying the materials.

The finished project can be submitted tocalculation of industrial heating installation.

Our projects

LLP “RG Gold”

Detailed documentation, supply, installation and commissioning of dust extraction of three crushing and sintering complexes.

Read More →

Frequently Asked Questions

Yes. Data will be needed from the existing system, available capacity and shutdown restrictions. We determine the need for an examination after studying the documentation.

Yes. Loads, heating devices and regulation are calculated for zones with different modes and requirements.

Yes, from the initial assessment. After studying the materials, the engineer will list the missing data and determine whether a visit is needed.

After checking the initial data, scope of work and site conditions. The proposal sets out the scope of work, assumptions and phasing.

The main geography is Karaganda, Pavlodar, Ust-Kamenogorsk, Zhezkazgan, Semey, Astana, Kokshetau, Kostanay and Petropavlovskovsk.

Articles on the topic

Warehouse ventilation

Order design and installation of warehouse ventilation ABL Engineering Group carries out a full cycle of work – from technical…

Office ventilation

Order installation and maintenance of office ventilation ABL Engineering Group carries out a full range of works on installation, configuration…

PDF, DWG, DXF, JPG, PNG, Doc or DOCX — up to 10 MB