Fonet Er-Tai AK Mining LLP
Complete installation of engineering systems and construction and installation works for the hydrometallurgical plant site.
Read More →We install dust extraction systems: local exhaust hoods, ducts, filters, fans, hoppers and dust discharge units. Filters and ducts are made at our own production in Temirtau.
They trust us
Installation of local exhaust hoods and enclosures at dust sources, extraction ducts, filters, fans, hoppers and rotary valves, as well as connection to power supply and automation within the agreed scope.
ABL makes bag filters and ducts for dust extraction in Temirtau, which shortens lead times and makes it easier to adapt components to the site.
Do you have a project, specification or photos? Attach materials and an engineer will check the data for evaluation.
Get CPSend the project or system diagram, the list of dust sources and equipment, plans and heights of the premises, dust characteristics (if known), site photos and timing requirements.
We prepare a commercial proposal after checking the initial data and work boundaries. The cost depends on the equipment, the scope and complexity of routes, height and access, the operating mode of the existing facility, materials and required documents. The timeline is agreed together with site access and equipment delivery.
Installation is carried out by ABL specialists in Central, Northern and Eastern Kazakhstan: Karaganda, Temirtau, Astana, Pavlodar, Kokshetau, Kostanay, Petropavlovsk, Ust-Kamenogorsk, Semey, Zhezkazgan. We supply equipment to any region of Kazakhstan. Installation in other regions and at remote sites is possible — travel and mobilization are calculated separately.
Complete installation of engineering systems and construction and installation works for the hydrometallurgical plant site.
Read More →A series of industrial orders for insulation and related work at the Linde production site…
Read More →Complete filter ventilation system: equipment, production of air ducts and installation on site in Karaganda.
Read More →Often yes, if the work is split into stages and agreed with the workshop schedule. Connections to operating equipment usually need short windows planned in advance.
The warranty on installation works is 12 months. Equipment is covered by the manufacturer’s or supplier’s warranty under the contract terms.
Yes, from the initial assessment. After studying the available materials, we will determine what data is missing and whether a site visit is needed.
After checking the initial data, equipment composition, scope of work and site conditions. The commercial proposal fixes the scope of work and calculation assumptions.
Installation — in Central, Northern and Eastern Kazakhstan. We supply equipment to any region of Kazakhstan; installation in other regions is calculated separately.
The engineer will examine the materials and clarify the missing parameters. We will agree on the deadline for preparing a commercial proposal after checking the initial data.