Kazmekhanomontazh No. 2 LLP
22 contracts and DS for 10 years: ventilation, engineering networks, thermal insulation and equipment for…
Read More →We are assessing the possibility of returning some of the heat from the exhaust air to the supply system. We select the type of heat exchanger, anti-freeze protection scheme and automation, taking into account contamination and the operating conditions of the facility.
They trust us
Recovery can reduce the heating or cooling load of the supply air if the system is running long enough and the exhaust parameters allow the heat exchanger to be used safely. The solution requires calculation: the percentage of heat return cannot be promised without air flow, temperature, humidity and operating conditions.
Dust, sticky aerosols, aggressive impurities, high humidity and the risk of contamination transfer influence the choice of circuit. In such cases, pre-treatment, separated flows or intermediate coolant are considered. Access for maintenance and cleaning is provided at the design stage.
Do you have a project, diagram or statement? Attach the file and the engineer will check the calculation data.
Get CPWe need air flow rates and temperatures, humidity, the composition of contaminants, work schedules, available coolants and a diagram of existing ventilation. If you have plans, a project, a specification, a photo of the site or a list of equipment, please attach them to the application. If there is insufficient data, the engineer will draw up a list of questions and determine the need for an examination.
We prepare a commercial proposal for the “Ventilation with heat recovery” service after checking the volumes and conditions of the facility. The price and duration are affected by the performance of the system, the length and cross-section of the networks, the composition of the equipment, the height of the work, automation, access to the site and the limitations of the existing production. A fixed price without this data would be unreliable.
We work with industrial facilities in Karaganda, Pavlodar, Ust-Kamenogorsk, Zhezkazgan, Semey, Astana, Kokshetau, Kostanay and Petropavlovskovsk. We evaluate the possibility of departure and mobilization after studying the task and site.
Recovery is considered as partsupply and exhaust ventilation, and not as a separate universal equipment.
22 contracts and DS for 10 years: ventilation, engineering networks, thermal insulation and equipment for…
Read More →Eight tasks for supply and exhaust ventilation of an existing service center in Karaganda.
Read More →Installation of ventilation and smoke removal with subsequent modernization of cooling of air supply units…
Read More →Only a calculation based on air flow, climatic parameters, operating mode and heat exchanger characteristics will give a useful assessment. A universal percentage for all objects is incorrect.
Sometimes yes, but cleaning, surface contamination and the risk of contaminant transfer must be assessed. For some processes, a split-flow scheme is chosen or recuperation is abandoned.
Yes, from the initial assessment. After studying the problem, we will determine how much research and design is needed before purchasing and installation.
After checking the initial data, volumes and site conditions. In the commercial proposal we fix the scope of work, delivery boundaries and calculation assumptions.
The main geography is Central, Northern and Eastern Kazakhstan: Karaganda, Pavlodar, Ust-Kamenogorsk, Zhezkazgan, Semey, Astana, Kokshetau, Kostanay and Petropavlovskovsk.
Order design and installation of warehouse ventilation ABL Engineering Group carries out a full cycle of work – from technical…
Order installation and maintenance of office ventilation ABL Engineering Group carries out a full range of works on installation, configuration…
Types of heating systems for industrial and commercial buildings, criteria for selecting equipment, energy efficiency and maintenance.
The engineer will examine the materials and clarify the missing parameters. We will agree on the deadline for preparing a commercial proposal after checking the initial data.