Object task
What needed to be done
Equip the site with ventilation, heating and climate control equipment and carry out the complex of construction and installation works provided for in the project.
ABL Area of Responsibility
What was done at the site
-
01
7 VR 85-77 fan units in four standard sizes.
-
02
Mounting frames, vibration isolators, flexible inserts, casings and control cabinets.
-
03
Water air heaters and electric fan heaters.
-
04
Three sets of ALMACOM climatic equipment.
Project scope