Installation of chillers and chiller-fan coil systems

We create centralized refrigeration systems for large and distributed facilities. We link the chiller, hydraulic circuit, pump groups, fan coils and automation.

  • Air or water cooled condenser
  • Pump groups, buffer tanks and hydraulic circuits
  • Cassette, duct and floor fan coils
  • Testing, balancing and setting up automation
since 2009 Engineering direction
40+ Core projects
Temirtau Own production
SMR II License No. 17014063

They trust us

Kazakhmys
Kazzinc
ArcelorMittal / Qarmet
TNK Kazchrome (ERG)
Borusan Makina
Polymetal
Kazakhstan Temir Zholy
01

When to choose a chiller-fan coil

The solution is used for facilities with a large total cooling capacity, long routes and a large number of zones. The water circuit allows consumers to be located at a considerable distance, but requires hydraulic calculations, frost protection and maintenance.

02

Composition of the engineering system

  • chiller and its installation site;
  • pumping groups and buffer tank;
  • pipelines, fittings and thermal insulation;
  • fan coil units and drainage;
  • replenishment, expansion and removal of air;
  • automation, accounting and dispatching.

Have plans, design or specification? Attach materials and an engineer will check the data for evaluation.

Get CP
03

What is critical during installation

We check the foundations and vibration insulation, access to heat exchangers, pipeline routes, drainage slopes, the quality of thermal insulation and the possibility of emptying the system. After installation, we carry out the tests, flushing, filling and balancing required by the project.

04

What to submit for evaluation

You need calculated loads by zone, plans and sections, chiller installation location, power supply parameters, redundancy requirements and winter operation mode. If the data is insufficient, the engineer will generate a list of clarifications.

05

What does the cost and term depend on?

The calculation is influenced by the power and type of chiller, the number of fan coils, the hydraulic circuit, the length and diameters of pipelines, pump groups, automation and lifting equipment. We fix the estimate after checking the initial data and work boundaries.

06

Geography and related solution

The main geography is Karaganda, Pavlodar, Ust-Kamenogorsk, Zhezkazgan, Semey, Astana, Kokshetau, Kostanay and Petropavlovskovsk. We will determine the possibility of leaving after studying the property.

For a multi-spectral facility without a water loop, considerVRF/VRV system.

Our projects

FLSmidth LLP

Complete filter ventilation system: equipment, production of air ducts and installation on site in Karaganda.

Read More →

Frequently Asked Questions

Depends on the criticality of the object and acceptable downtime. The redundancy scheme is determined by the task and the design load.

Yes, if the equipment and design provide for the required mode, protection of the hydraulic circuit and automation algorithm.

Yes, from the initial assessment. The engineer will check the available plans and parameters of the site, then list the missing data and the required design scope.

After checking the design load, equipment composition, routes, automation and installation conditions. The proposal sets out boundaries and assumptions.

Central, Northern and Eastern Kazakhstan: Karaganda, Pavlodar, Ust-Kamenogorsk, Zhezkazgan, Semey, Astana, Kokshetau, Kostanay and Petropavlovskovsk.

Articles on the topic

Warehouse ventilation

Order design and installation of warehouse ventilation ABL Engineering Group carries out a full cycle of work – from technical…

Office ventilation

Order installation and maintenance of office ventilation ABL Engineering Group carries out a full range of works on installation, configuration…