Fonet Er-Tai AK Mining LLP
Complete installation of engineering systems and construction and installation works for the hydrometallurgical plant site.
Read More →We calculate heat inflows by room, select the type of system and issue documentation for purchase and installation. We take into account technological equipment, zone modes, redundancy and available capacity.
They trust us
We determine external and internal design conditions, heat input through fences, from people, lighting and technological equipment. For rooms with variable load, we divide the modes by time and zones.
For server and critical premises, we separately fix the requirements for redundancy, year-round operation and the permissible range of parameters.
We make the choice based on calculations, route limitations, operation and redundancy, and not on the equipment brand.
Do you have a project, plans or terms of reference? Attach materials and an engineer will check the data for evaluation.
Get CPWe will agree on the exact composition of the documentation before the start of design.
We need plans and heights of the premises, purpose of zones, operating mode, number of people, heat dissipation of equipment, requirements for temperature and humidity, data on power supply. If some of the data is missing, attach available materials and describe the task – the engineer will generate a list of clarifications.
The assessment is influenced by the number of zones, the availability of source data, the complexity of thermal loads, redundancy requirements, the length of routes and the composition of the issued documentation. We determine the price and term only after checking the initial data. In the commercial proposal we fix the composition, boundaries of work, assumptions and phasing.
We work in Central, Northern and Eastern Kazakhstan: Karaganda, Pavlodar, Ust-Kamenogorsk, Zhezkazgan, Semey, Astana, Kokshetau, Kostanay and Petropavlovskovsk. The need for departure and the mobilization schedule are determined after studying the materials.
The finished project can be submitted tocalculation of installation of industrial air conditioning.
Complete installation of engineering systems and construction and installation works for the hydrometallurgical plant site.
Read More →A series of industrial orders for insulation and related work at the Linde production site…
Read More →Complete filter ventilation system: equipment, production of air ducts and installation on site in Karaganda.
Read More →Yes. First, we fix the requirements for premises and equipment, then we create a list of initial data and the composition of the design documentation.
Yes, if this is provided for in the task. The redundancy scheme and rotation algorithm are determined by the acceptable shutdown risk and the actual heat load.
Yes, from the initial assessment. After studying the materials, the engineer will list the missing data and determine whether a visit is needed.
After checking the initial data, scope of work and site conditions. The proposal sets out the scope of work, assumptions and phasing.
The main geography is Karaganda, Pavlodar, Ust-Kamenogorsk, Zhezkazgan, Semey, Astana, Kokshetau, Kostanay and Petropavlovskovsk.
Types of heating systems for industrial and commercial buildings, criteria for selecting equipment, energy efficiency and maintenance.
Installation of ventilation systems at sites: preparation, laying of air ducts, installation of equipment, commissioning and delivery.
A complete guide to designing HVAC systems for commercial and industrial facilities. Norms, stages, standard solutions.
The engineer will examine the materials and clarify the missing parameters. We will agree on the deadline for preparing a commercial proposal after checking the initial data.