Fonet Er-Tai AK Mining LLP
Complete installation of engineering systems and construction and installation works for the hydrometallurgical plant site.
Read More →We install air ducts, ventilation units, fans, filters and automation in factories, workshops and warehouse complexes. We work on a ready-made project or after our own engineering training.
They trust us
We assemble the system on site: we install ventilation units and fans, lay air ducts, install valves, filters, grilles, noise suppressors, supports and automation elements. The specific composition is fixed in the estimate and contract for the project or bill of quantities.
If the documentation is incomplete, we check the routes, access to installation areas, equipment installation locations and connection points before making a commercial proposal.
This review reduces the risk of downtime, rework, and conflicts with other contractors on site.
Do you have a project or statement? Submit the materials and we will check the composition of the data for the calculation.
Get CPThe calculation is influenced by the volume and cross-section of the air ducts, the weight and location of the equipment, the height of the work, the condition of the site, the need for metal structures, automation, lifting equipment and stage-by-stage implementation in the existing production.
Therefore, a fixed price without a project is misleading. We prepare a commercial proposal after checking the documentation and conditions of the object; We will coordinate the work period together with the delivery schedule and access to the site.
The installed system in the agreed volume, the results of the inspections provided for in the contract and a set of executive documents. The list of documents, testing regimes and boundaries of responsibility are fixed before the start of work, so that delivery does not depend on oral agreements.
If the project is not ready yet, start withindustrial ventilation design.
Main regions of work: Karaganda, Pavlodar, Ust-Kamenogorsk, Zhezkazgan, Semey, Astana, Kokshetau, Kostanay and Petropavlovskovsk. We evaluate the possibility of mobilization, departure and work schedule after studying the project and site conditions.
Complete installation of engineering systems and construction and installation works for the hydrometallurgical plant site.
Read More →A series of industrial orders for insulation and related work at the Linde production site…
Read More →Complete filter ventilation system: equipment, production of air ducts and installation on site in Karaganda.
Read More →Yes. Send us your project, specifications and available bills of quantities. Before the calculation, we will check the completeness and ask questions about the site, equipment supply and schedule.
First, we examine the initial data and determine the required scope of design. Starting installation without an approved scheme for an industrial facility is risky due to possible alterations and conflicts with adjacent systems.
Sometimes yes – in sections or through technological windows. The feasibility and sequence are determined after inspecting the site and agreeing on safety requirements with the customer.
Various configuration schemes are possible. We fix the delivery boundaries of the customer and the contractor in the commercial proposal and contract. We can produce air ducts and fittings at our own production facility in Temirtau.
After checking the design and site conditions. We take into account the volume, height of work, weight of equipment, access, metal structures, automation, lifting equipment and limitations of existing production.
The main geography is Central, Northern and Eastern Kazakhstan: Karaganda, Pavlodar, Ust-Kamenogorsk, Zhezkazgan, Semey, Astana, Kokshetau, Kostanay and Petropavlovskovsk.
The engineer will examine the materials and clarify the missing parameters. We will agree on the deadline for preparing a commercial proposal after checking the initial data.