Designing ventilation and air conditioning systems is a key stage in creating a comfortable microclimate at the site. A well-designed project can reduce energy consumption by 30–50% and ensure compliance with sanitary standards SN RK 4.02-105-2014.2020.

Composition of project documentation

The HVAC project includes a calculation and explanatory note, schematic diagrams, plans for arranging equipment and laying air ducts, specifications of equipment and materials. Each section is developed in accordance with GOST and the customer’s technical specifications.

Air exchange calculation

Air exchange is calculated based on the purpose of the room, the number of people, heat emissions from equipment and air quality requirements. For offices, the standard is at least 60 m³/h per person according to SanPiN 1.2.3685-21.

Selection of equipment

When selecting ventilation units and air conditioners, air flow, noise level, energy efficiency (class A+/A++) and compatibility with the dispatch system are taken into account. We work with equipment from trusted European and Asian manufacturers and select it for the purpose of the facility.