Project objective
What needed to be done
Perform work at an existing metallurgical site as part of the expansion of ferroalloy production and a separate stage in the smelting shop.
ABL Area of Responsibility
What ABL has accomplished
-
01
Industrial thermal insulation during the expansion of ferroalloy shop No. 4.
-
02
Works at the Aksu-1 production site.
-
03
Construction and installation work in smelting shop No. 1.
-
04
Two independent stages of cooperation in 2019 and 2023.
Project Development
Key Milestones
-
2019
Ferroalloy shop No. 4
Industrial thermal insulation as part of the expansion of the production site.
-
2023
Smelting shop No. 1
Construction and installation work on the site of the existing workshop.
Project scope