Eastern Kazakhstan field teams deployed from Temirtau

Industrial ventilation and aspiration in Semey

We carry out the design, manufacture and installation of engineering systems for mining, processing and production facilities in the Abay region.

Send project to WhatsApp

For the calculation, the TOR, workshop plan, specification or photo of the site is enough.

Foundations to be inspected

Confirmed projects in the region

The reference regional case is the Bakyrchik State Traffic Police Station in the village of Auezov, Abay region. In 2017–2018, contracts confirm RMM engineering systems and modernization of heating and ventilation of the laboratory building.

Non-typical "area ventilation"

What we take into account in projects for the region

01

Mining dust

We localize emissions on spillways and equipment, calculating each branch of the network.

02

Cold climate

We take into account inflow heating, coolant protection and system shutdown modes.

03

Remote industrial site

Before delivery, we will agree on the completeness, installation components and support requirements.

Customer profile

Sectors of Semey and the region

  • Gold mining and beneficiation
  • Mining enterprises
  • Industrial processing
How we organize work in Semey

We do not declare a branch in the city. Design and production are carried out from Temirtau; equipment is delivered to the site, installation is carried out by an on-site team. We fix the schedule and logistics after studying the terms of reference and the address of the facility.

Path from the request to the site

How the project starts

  1. 01Getting the input data

    TOR, plans, photos, environmental parameters and equipment operation mode.

  2. 02Reviewing task

    The engineer clarifies the boundaries of the work and the data without which the calculation will be inaccurate.

  3. 03Prepare the solution and quotation

    We record the composition of equipment, work, documentation and terms of delivery.

  4. 04Manufacture and mobilize to site

    We will coordinate the terms of delivery and installation according to the address and readiness of the site.