Mining dust
We localize emissions on spillways and equipment, calculating each branch of the network.
Eastern Kazakhstan field teams deployed from Temirtau
We carry out the design, manufacture and installation of engineering systems for mining, processing and production facilities in the Abay region.
For the calculation, the TOR, workshop plan, specification or photo of the site is enough.
Foundations to be inspected
The reference regional case is the Bakyrchik State Traffic Police Station in the village of Auezov, Abay region. In 2017–2018, contracts confirm RMM engineering systems and modernization of heating and ventilation of the laboratory building.
Non-typical "area ventilation"
We localize emissions on spillways and equipment, calculating each branch of the network.
We take into account inflow heating, coolant protection and system shutdown modes.
Before delivery, we will agree on the completeness, installation components and support requirements.
Customer profile
We do not declare a branch in the city. Design and production are carried out from Temirtau; equipment is delivered to the site, installation is carried out by an on-site team. We fix the schedule and logistics after studying the terms of reference and the address of the facility.
Path from the request to the site
TOR, plans, photos, environmental parameters and equipment operation mode.
The engineer clarifies the boundaries of the work and the data without which the calculation will be inaccurate.
We record the composition of equipment, work, documentation and terms of delivery.
We will coordinate the terms of delivery and installation according to the address and readiness of the site.
Single Responsibility