Northern Kazakhstan field teams deployed from Temirtau

Industrial ventilation and aspiration in Petropavlovsk

The region is included in the ABL exit zone: we design and complete systems for agricultural processing, mechanical engineering and industrial buildings.

Send project to WhatsApp

For the calculation, the TOR, workshop plan, specification or photo of the site is enough.

Maintenance area

Site visit after learning the task

Petropavlovsk is within our agreed field-service area. The verified register does not yet contain a separate public case for the city, so we do not claim clients or facilities without evidence. We need the site address, scope of work and preferred schedule to estimate mobilization.

Non-typical "area ventilation"

What we take into account in projects for the region

01

Agricultural dust

We fix the properties of the product and the overload points before calculating the dust extraction network.

02

Low outside temperature

We take into account inflow heating, heat recovery and protection of water sections from freezing.

03

Delivery of a complete solution

We will agree on the scope of delivery, installation components and documentation before shipment from Temirtau.

Customer profile

Industries of Petropavlovsk and the region

  • Agro-processing and storage
  • Mechanical engineering
  • Industrial and warehouse buildings
How to organize work in Petropavlovsk

We do not declare a branch in the city. Design and production are carried out from Temirtau; equipment is delivered to the site, installation is carried out by an on-site team. We fix the schedule and logistics after studying the terms of reference and the address of the facility.

Path from the request to the site

How the project starts

  1. 01Getting the input data

    TOR, plans, photos, environmental parameters and equipment operation mode.

  2. 02Reviewing task

    The engineer clarifies the boundaries of the work and the data without which the calculation will be inaccurate.

  3. 03Prepare the solution and quotation

    We record the composition of equipment, work, documentation and terms of delivery.

  4. 04Manufacture and mobilize to site

    We will coordinate the terms of delivery and installation according to the address and readiness of the site.