Welding and metalworking
We design the suction at the source; We determine productivity after taking inventory of posts.
Northern Kazakhstan field teams deployed from Temirtau
The region is included in the ABL field work zone: we calculate ventilation and dust extraction for mechanical engineering, metalworking and agricultural processing.
For the calculation, the TOR, workshop plan, specification or photo of the site is enough.
Maintenance area
Kostanay is within our agreed field-service area. The verified register does not yet contain a separate public case for the city, so we do not claim clients or facilities without evidence. We need the site address, scope of work and preferred schedule to estimate mobilization.
Non-typical "area ventilation"
We design the suction at the source; We determine productivity after taking inventory of posts.
Before selecting equipment, we clarify the risk of explosion, humidity and operating mode of the transport.
We calculate the cost and delivery schedule based on dimensions, address and unloading conditions.
Customer profile
We do not declare a branch in the city. Design and production are carried out from Temirtau; equipment is delivered to the site, installation is carried out by an on-site team. We fix the schedule and logistics after studying the terms of reference and the address of the facility.
Path from the request to the site
TOR, plans, photos, environmental parameters and equipment operation mode.
The engineer clarifies the boundaries of the work and the data without which the calculation will be inaccurate.
We record the composition of equipment, work, documentation and terms of delivery.
We will coordinate the terms of delivery and installation according to the address and readiness of the site.
Single Responsibility