Industry engineering solution

Dust extraction and industrial ventilation for metallurgy

We design, manufacture and install systems for hot, dusty and active workshops. We start the calculation with emission sources, equipment modes and site limitations.

Send task to WhatsApp

Without input data, we do not promise a filtration efficiency, delivery time or regulatory compliance.

First, the production task

What determines the engineering solution

01

Dust on crushing and pouring

We determine dust points, simultaneous operation and the required flow rate of each local suction.

02

Heat and aerosols from hot processes

We take into account temperature, convective flows and compensatory inflow, and not just the volume of the workshop.

03

Reconstruction without stopping production

We check the routes, access for installation and the possibility of phased connection to existing systems.

Verified under contracts

Relevant ABL projects

The case of the Aksu Ferroalloy Plant remains in the public portfolio for the industry. The volume and periods are described only for verified contracts.

The price and term depend on the input data

What we need to prepare a detailed proposal

If there is no complete project, send what you already have. The Engineer will indicate the missing data and the boundaries of the preliminary calculation.

  • Workshop plans and equipment arrangement
  • List of dust and heat sources
  • Composition, temperature and release properties
  • Modes and simultaneity of operation
  • Existing networks and connection points
  • Stopping and installation restrictions

One engineering loop

From input data to installation

  1. 01Task parsing

    Technology, sources, modes and limitations.

  2. 02Calculation and design

    Scheme, costs, equipment and work boundaries.

  3. 03Production

    Manufacturing of equipment and network in Temirtau.

  4. 04Installation and commissioning

    Works at the site according to the agreed program.

The next step

Submit a task for the Metallurgy and Ferroalloys industry

Attach the TOR, plan, specification or photo of the site. The answer will contain questions on the data and a possible composition of the solution — without promises blindly.