Ventilation calculator

Express assessment online. The engineer of ABL Engineering Group will prepare an accurate calculation with the selection of equipment free of charge.

Required air exchange
Regulatory air exchange rates (SN RK 4.02-105-2014)
Required air exchange
2 400 m³/h
Cost of air ducts
Materials — according to the price list produced by ABL; installation — a guide to the enlarged estimate indicators for the Republic of Kazakhstan
Area m² · tentative
Ducting: from KZT
Installation (estimate landmark): from KZT
total from KZT

The calculation is a preliminary one and is not a quotation. The exact cost is determined after studying the project, specification, tracing, fittings, altitude, installation conditions and requirements of the facility.

Send data to engineer