Aksu Ferroalloy Plant JSC TNK Kazchrome
Two stages of industrial work at the Aksu Ferroalloy Plant site: thermal insulation and construction…
Read More →We supply Hitachi Katana and OUTES fan coil units and install chiller-fan coil systems: fan coils, chilled water piping, drainage and connection to automation.
They trust us
Installation of fan coils (cassette, ducted, floor-ceiling), chilled and hot water piping, shut-off and control valves, drainage lines, connection to power supply and automation within the agreed scope.
We supply the fan coils ourselves: Hitachi Katana and OUTES, 2-pipe and 4-pipe versions.
Do you have a project, specification or photos? Attach materials and an engineer will check the data for evaluation.
Get CPSend the project or room plans with loads, chilled water parameters, ceiling types and noise requirements.
We prepare a commercial proposal after checking the initial data and work boundaries. The cost depends on the equipment, the scope and complexity of routes, height and access, the operating mode of the existing facility, materials and required documents. The timeline is agreed together with site access and equipment delivery.
Installation is carried out by ABL specialists in Central, Northern and Eastern Kazakhstan: Karaganda, Temirtau, Astana, Pavlodar, Kokshetau, Kostanay, Petropavlovsk, Ust-Kamenogorsk, Semey, Zhezkazgan. We supply equipment to any region of Kazakhstan. Installation in other regions and at remote sites is possible — travel and mobilization are calculated separately.
Equipment: fan coil units, chillers.
Two stages of industrial work at the Aksu Ferroalloy Plant site: thermal insulation and construction…
Read More →Complete installation of engineering systems and construction and installation works for the hydrometallurgical plant site.
Read More →A series of industrial orders for insulation and related work at the Linde production site…
Read More →2-pipe units are cheaper but work in one mode for the whole system. 4-pipe units allow cooling and heating different rooms at the same time.
The warranty on installation works is 12 months. Equipment is covered by the manufacturer’s or supplier’s warranty under the contract terms.
Yes, from the initial assessment. After studying the available materials, we will determine what data is missing and whether a site visit is needed.
After checking the initial data, equipment composition, scope of work and site conditions. The commercial proposal fixes the scope of work and calculation assumptions.
Installation — in Central, Northern and Eastern Kazakhstan. We supply equipment to any region of Kazakhstan; installation in other regions is calculated separately.
Order design and installation of warehouse ventilation ABL Engineering Group carries out a full cycle of work – from technical…
Order installation and maintenance of office ventilation We carry out installation in Central, Northern and Eastern Kazakhstan and supply equipment…
Types of heating systems for industrial and commercial buildings, criteria for selecting equipment, energy efficiency and maintenance.
The engineer will examine the materials and clarify the missing parameters. We will agree on the deadline for preparing a commercial proposal after checking the initial data.